There was installations where the suction head is  higher than delivery head and 
or delivery line under high vacuum
This causing syphoning , and flowrate will not be be accurrate , often very much higher than
set at the Metering pump . 
Solution 
a) Installing a back Pressure Valve 
b) pressure loading valve 
or 
c) Installing a Pressure relief valve to the Pipeline or vessel under high vacuum
This (c) is the simplest cost effective solution 
No comments:
Post a Comment