27.8.10
AMK OPEN IMPELLER PUMPS
AMK SERIES
OPEN IMPELLER
MATERIAL IS SS 304 OR SS316
PUMP SIZE , 3X 2 , 4 X 3 , 6 X 4
SOLID SIZE : MAX 30MM
SOLID CONTENT : MAX 30 %
SHAFT SIZE : 1 1 /2 '' FOR ALL PUMPS
SHAFT SEALING :MECHSEAL -SILICONE CARBIDE
BEARINGS : DOUBLE BEARING FOR DRIVEN END
OIL BATH LUBRICATION
APPLICATION : CHEMICAL . EFFLEUNT .SLUDGE , WASTE TREATMENT
FOR HIGH CORROSIVE MEDIA , DRIP PAN BELOW STUFFING BOX IS PROVIDED SO THAT THE CHEMICALS WILL LEAK ON THE CAST IRON BEARING BRACKET OF THE PUMP
EXTERNAL WATER FLUSH IS PROVIDED FOR THICK SLURRY APPLICATION
JACKETED (HOT WATER OR STEAM ) ARE AVIALABLE FOR PRODUCTS THAT NEED HEATING UP , SUCH AS STEARIN . CPO ETC
STEAM TRACING IS NOT EFFICIENT AND SLOW TO HEAT UP
PALM OIL MILL - TREATED EFFLUENT LAND DISPOSAL OR COMPOSITE
Dear Zainuddin
As per your request , submersible pump is applicable for this job but take note as follow
a) pump impeller has to be non clog design, as the effluent will contain high solids and the solid content
depend very much on which location of the pond you locate the pump
b) Submersible pumps are centirfugal pmps , and flow will dropped sharply if the discharge pressure
increased , the Pipe is likely to be clogged due to scaling after sometime
c) if you are pumping about 1000kilometers away , need to work out the discharge pressure in the system carefully or you may no discharge at the end
d) Two stage Progessive cavity pumps will be most suitable as it can handle higher solid content, positive displacement and max pressure of 12 bar
e) as this is not a production pumps , dont go for too big or oversize capacity as bigger pump means not only paying more for the pump but also higher maintenace spares . A capacity of 40 to 60 m3 hr should be ideal
As per your request , submersible pump is applicable for this job but take note as follow
a) pump impeller has to be non clog design, as the effluent will contain high solids and the solid content
depend very much on which location of the pond you locate the pump
b) Submersible pumps are centirfugal pmps , and flow will dropped sharply if the discharge pressure
increased , the Pipe is likely to be clogged due to scaling after sometime
c) if you are pumping about 1000kilometers away , need to work out the discharge pressure in the system carefully or you may no discharge at the end
d) Two stage Progessive cavity pumps will be most suitable as it can handle higher solid content, positive displacement and max pressure of 12 bar
e) as this is not a production pumps , dont go for too big or oversize capacity as bigger pump means not only paying more for the pump but also higher maintenace spares . A capacity of 40 to 60 m3 hr should be ideal
COOLANT PUMPS -CNC MACHINE
Recently came across a CNC machine running with small amount of coolant discharge from the pump
Checked and found
a) Pump is too small , only about the size of a coffee cup and how much the flow we can expect ?
b) pump running on wrong rotation
c) although it may seem ro be alright , but lack of coolant accelerate the wear and damages of the tools
and these tools can be expensive
The point here , is machine makers or users failed to understand " quantity or flow in case " must be
right in any application
Suggestion : since there are few discharge nozzles around the millling tools and only one nozzle is discharging
coolant .the pump is definitely undersize .Determine the flow required from the manual or from
the pump at another machine which is big and performing . Replace the pump
Checked and found
a) Pump is too small , only about the size of a coffee cup and how much the flow we can expect ?
b) pump running on wrong rotation
c) although it may seem ro be alright , but lack of coolant accelerate the wear and damages of the tools
and these tools can be expensive
The point here , is machine makers or users failed to understand " quantity or flow in case " must be
right in any application
Suggestion : since there are few discharge nozzles around the millling tools and only one nozzle is discharging
coolant .the pump is definitely undersize .Determine the flow required from the manual or from
the pump at another machine which is big and performing . Replace the pump
Earlier Postings
FOR COMMENTS ON PUMP SELECTION SIZING AND OTHER INFORMATIONS , PLEASE LOOK AT EARLIER POSTINGS
THANK YOU
THANK YOU
Subscribe to:
Posts (Atom)